Screen hazard exposure and risk priorities
Define the assets and assumptions before interpreting a risk map.
Infrastructure → Disaster
Before you begin
- Prepare the hazard area, asset locations, and supported exposure/vulnerability inputs.
Follow these steps
0/4Tick steps yourself as you go. This checklist lasts for this visit; it does not verify or save your work.
Define the area and assets
Import the supported AOI and asset records. Check positions, identifiers, units, and required values.
Review hazard assumptions
Use the supported hazard/exposure/vulnerability values and explain their source. Do not enter guessed values as if they were measurements.
Calculate and inspect screening priorities
Run the offered screening action and compare results on the map. Check missing inputs and unusual outliers.
Review the scenario/output
Preserve the inputs and assumptions with the supported scenario/map pack. Confirm current conditions through the appropriate operational authority.
What success looks like
Risk priorities can be explained in terms of the supplied assets and assumptions.
Know the limits
A screening risk score is not an emergency forecast, warning, or certified safety assessment.
What to do next
Some tools need a project, a role, a connection, or an available service. A guide does not grant access or guarantee a professional-grade result.