Review exploration site access
Use the site-access page for a boundary and its limits. Mineral confirmation is refused here.
Domains → Exploration. The planning grid is Geoscience → Exploration planning.
Before you begin
- Prepare an area boundary. A project is required only when you save organisation work.
- Sign in with a role that can open the project. This guide does not grant that role.
Follow these steps
0/4Tick steps yourself as you go. This checklist lasts for this visit; it does not verify or save your work.
Open site access, not the grid planner
This page is for exploration site access. Collar spacing and the planning grid are on Exploration planning. Do not expect this page to design a drill grid.
Read mineral confirmation as a limit
Mineral confirmation is refused. The refusal is an unavailable capability, not a failed analysis and not a resource statement. Do not treat it as statutory approval.
Keep catalog rows in their own state
An unavailable catalog record is not a working map layer. Use a file or a drawn boundary when you need an area. The guide does not enable a catalog row.
Recover from the message you actually see
Missing area or project is a prerequisite. Access denied is a role limit. A refused mineral action stays refused. A service error names the failed request and is not cleared by opening help.
What success looks like
You can tell site access from the planning grid, and you can read a mineral-confirmation refusal as a limit.
Know the limits
Site-access screening does not establish legal permission, a mineral resource, or a certified design.
What to do next
Some tools need a project, a role, a connection, or an available service. A guide does not grant access or guarantee a professional-grade result.