Plan an exploration grid
Locate an area, set spacing in metres, and review a planning grid. The tour does not run the plan.
Geoscience → Exploration planning. Site access is a different page under Domains → Exploration.
Before you begin
- Sign in if you need to save organisation work. A project is required for saved outputs, not for reading this guide.
- Prepare an area as longitude/latitude GeoJSON, KML, or a drawn polygon. A projected area needs EPSG:326xx or EPSG:327xx. EGIS does not guess a CRS.
- Spacing is metres. Presets are 50, 100, and 200. Degree and arcsecond are not distance units.
Follow these steps
0/4Tick steps yourself as you go. This checklist lasts for this visit; it does not verify or save your work.
Locate the boundary
Use Locate Site or import a boundary file. Check the position on the map. The synthetic example in this guide is a fictional square, not customer data or geological evidence, and copying it does not load the area.
Set the grid spacing
Choose a preset or enter a spacing greater than zero metres. East and north spacing use metres. Azimuth, when shown, is degrees clockwise from north. An invalid spacing is explained beside the field and does not replace the last accepted value.
Read the expected output
A successful plan is a draft of proposed collars and tracks. It is not proof of access, a drilled position, or a mineral resource. An empty or refused result stays visible. Nothing in this tour requests that plan.
Plan only when you mean to
Plan on AOI uses the current boundary. Generate demo grid is a separate action: it replaces the current area with a synthetic demo and requests a plan. Leave both alone while you are only reading help.
Start the tour
What success looks like
You can see the area, a valid metre spacing, and the plan action without having submitted a plan from the guide.
Know the limits
A planning grid is not a mineral resource, a reserve, statutory permission, or proof that the ground can be drilled. Site access on Domains → Exploration refuses mineral confirmation.
If you get stuck
No area is loaded
Add an area boundary before planning the grid. The tour does not upload one.
Spacing is not a positive number of metres
Spacing must be greater than zero metres. Degree and arcsecond are not distance units.
The account cannot open the project
This account cannot use the project. A guide does not grant access.
Mineral confirmation or an unavailable catalog row was expected
Mineral confirmation is refused, and an unavailable catalog record is not a map layer. Use the planning grid on Exploration planning, or read the refusal.
The planning service failed
The planning service failed. Read the message and choose Plan again only if you still want a plan.
What to do next
Some tools need a project, a role, a connection, or an available service. A guide does not grant access or guarantee a professional-grade result.