Review a geological model or resource-analysis task
Make source data, domains, interpolation assumptions, and uncertainty explicit.
Studios → Geological Modelling / Resource Analytics
Before you begin
- Prepare validated observations/drillholes and the supported model inputs.
- Know the intended domains, units, and analysis purpose; demanding modelling is desktop-oriented.
Follow these steps
0/4Tick steps yourself as you go. This checklist lasts for this visit; it does not verify or save your work.
Place: select the modelling context
Bind the project and inspect the requested source data and spatial bounds.
Run: review the model parameters
Use the supported interpolation/modelling settings. Check domains, sampling, density/grade conventions, and any required parameters.
Inspect the result
Read the real model/output and quality/uncertainty information. Compare it with the observations rather than accepting a visually smooth model automatically.
Result: retain an auditable interpretation
Open the actual saved result and preserve the inputs, parameter choices, and limitations with it.
What success looks like
The model is reviewable against its source data and explicit assumptions.
Know the limits
A model or grade–tonnage calculation is not a formal resource/reserve statement or competent-person sign-off.
If you get stuck
The task is unavailable or refuses to run
Read the live status and input feedback. Check project binding, required data, permissions, and provider/engine readiness. Do not treat a sample, plan, or preview as completed processing.
What to do next
Some tools need a project, a role, a connection, or an available service. A guide does not grant access or guarantee a professional-grade result.