Check a survey control network
Bind the site, run the supported adjustment/check, and review quality evidence.
Studios → Survey Control
Before you begin
- Use verified observations/control data and known coordinate/height units.
- Choose the intended project; keep a source copy of the observations.
Follow these steps
0/4Tick steps yourself as you go. This checklist lasts for this visit; it does not verify or save your work.
Place: bind the project
Select the project and locate the survey area. Confirm the control/reference-frame context.
Run: supply the requested observations
Use the supported network/adjustment controls and review all required inputs. Do not substitute guessed control coordinates.
Review quality
Inspect the actual adjustment/check result, residuals, closures, and uncertainty where produced. A completed calculation can still reveal an unacceptable network.
Result: preserve the evidence
Open the saved map/project result and retain the observation source and parameters for qualified survey review.
What success looks like
The adjustment/check is traceable and its quality findings have been reviewed.
Know the limits
A software result is not a survey-grade certificate or statutory control approval.
If you get stuck
The task is unavailable or refuses to run
Read the live status and input feedback. Check project binding, required data, permissions, and provider/engine readiness. Do not treat a sample, plan, or preview as completed processing.
What to do next
Some tools need a project, a role, a connection, or an available service. A guide does not grant access or guarantee a professional-grade result.