Choose a survey and boundary workflow
Keep control, field observations, boundary construction, and review distinct.
Survey → overview / relevant Studio
Before you begin
- Have the survey source, CRS, units, observation/control information, and intended project.
Follow these steps
0/4Tick steps yourself as you go. This checklist lasts for this visit; it does not verify or save your work.
Choose the right stage
Use Survey Control for adjustment checks, Boundary for bearing/distance construction, and Field-to-Finish for coded observations and surface work.
Select the project and inputs
Check project binding and the expected file/schema. Keep original observations and control values unchanged in a source copy.
Review quality information
Read residuals, closure, validation, and uncertainty where the workflow supplies them. A map that looks correct can still contain a unit or control error.
Preserve and review
Open the actual result and retain source/parameters. Use qualified survey review before legal or certified use.
What success looks like
The survey stage, data requirements, and necessary quality checks are clear.
What to do next
Some tools need a project, a role, a connection, or an available service. A guide does not grant access or guarantee a professional-grade result.